Gypsum Board Installation On Concrete Wall

Refer to page 66.
Gypsum board installation on concrete wall. Chapter 4 backerboard installation. Cut the nozzle end of a tube of construction adhesive at a 45 degree angle using a utility knife. Quantity includes typical waste overage material for repair and local delivery. Enjoy the videos and music you love upload original content and share it all with friends family and the world on youtube.
How to install gypsum board. Poke the foil cover at the. The gypsum board wall can be nailed to the interior frame by using either single or double nailing methods. Gypsum board over masonry or monolithic concrete install gypsum board by hand pressing each board tight to the wall and ensuring that all daubs are in positive contact with the board.
Use of gypsum board in construction gypsum board is a building material frequently used in construction works such as ceilings suspended ceilings and partition walls. If necessary to hold boards straight plumb and in proper. 4 x 8 sheets. How to glue drywall to the interior of concrete block walls.
Layout fabricate and fit. Gold bond brand fire shield c gypsum board has a specially formulated type x core to achieve superior performance when used in specific fire rated assemblies. Use concrete nails and a concrete nail gun to attach the hat channels to the wall after drawing a plumb line to make. Using a scraper scrape off chunks of debris from the wall to make it as smooth as possible.
Gypsum board is manufac tured with a type x core to achieve fire resistance ratings when used in recommended systems. May be used in designs requiring fire shield. Durock brand cement board products and installation procedures including proper attachment taping and finishing. In this post we will explain the different steps you must take to install your own gypsum board successfully.
Drywall installation labor basic basic labor to install drywall with favorable site conditions. Chapter 5 finishing drywall systems. If you wish to perform a double nail fitting apply one layer of nails every 12 inches and then add a second layer which is 2 and a half inches from the first set of nails. Add some rigid board insulation between the hat.
Encompasses moisture and climatic considerations proper framing fasteners and finishing options in baths kitchens floors and specialty uses. Paper faced 1 2 thick gypsum board.